Renovating in Two Stages in Singapore: What to Do Now and What Can Wait

Guide · By Larry Hoo, HDB Licensed Renovation Contractor ·
Renovating in Two Stages in Singapore: What to Do Now and What Can Wait

Pictured above: the ceiling of the car porch and side passage on a three-storey semi-detached house we are renovating, with the boards up, the joints and screw holes filled, and the wiring left hanging ready for the lights. The boards are not painted and no fitting is on yet. That is exactly the kind of half-finished stage a two-stage renovation has to leave behind properly.

A lot of owners cannot, or do not want to, spend the whole renovation budget in one go. The sensible-sounding plan is to do the essentials now, move in, and finish the rest later when there is more money or a clearer idea of what the flat needs. That plan can work well. It can also leave you paying twice for the same wall, because some work can wait a year at no cost and some work becomes harder, dirtier or more expensive the moment the flat has furniture in it.

This guide is about drawing that line before you sign. It has no prices in it. What each stage costs depends on your flat and your scope, and we only quote after we have seen the flat.

The one rule that decides most of it

Work that goes behind a surface has to happen in stage one. Work that sits on top of a surface can usually wait.

Pipes in the wall, cables above the ceiling, the waterproofing under the bathroom tiles, the screed under the floor: once the surface is closed, getting back behind it means hacking, chasing or lifting something you have just paid for. A wardrobe, a TV console or a feature wall sits on the finished surface. It can be added later without disturbing anything under it, provided stage one left the right things ready for it.

That last clause is where most two-stage jobs go wrong, and the rest of this guide is about it.

What belongs in stage one

What can wait

Five ways a two-stage renovation goes wrong

1. Carpentry later, but the points are in the wrong place

Sockets and switches are set against a plan. If the carpentry is not drawn yet, nobody knows which sockets will end up behind a panel, under a shelf or at the wrong height for a desk. The fix is to draw the future carpentry, even roughly, before the electrician marks the walls, and to mark every point against it. If you will not do that, ask for a few extra points in the rooms you are leaving for later, because adding a point to a finished wall means chasing it.

2. The flooring that runs under furniture that is not there yet

If the carpentry is still to come, decide now whether the floor runs under it or stops at it. A built-in wardrobe on top of the floor and a built-in that sits on the slab behind a skirting are different jobs. This is a measurement you can only give your contractor if the carpentry is planned, which is one more reason to plan it on paper in stage one.

3. Noisy work after you have moved in

Fitting carpentry and drilling are quieter than hacking, but they are not silent. The permitted-hours rules and the neighbour complaints do not stop applying because the job is small. Read our guide to renovation noise rules before you promise your neighbours it will be quiet, and see renovating while living in the flat for how to plan around it.

4. Two contractors and nobody owning the joins

Some owners use one contractor for stage one and a different one for stage two to save money. The risk is the join. If a stage-two cabinet does not sit flush on a stage-one wall, or a stage-two electrician finds a cable in the wrong place, each side can say the other started it. If you split the job, ask each contractor in writing what is covered, and ask who is responsible for anything that fails where the two stages meet.

5. A price that has quietly moved

A quotation written today for work to be done next year is only as good as its stated validity. Ask in writing how long a stage-two price holds, and what happens to it if the measurements change. Do not assume that a price you were given for the whole job still applies to half of it. Our guide to variation orders covers what happens when the scope shifts after the job has started.

Where this fits with the order of works

The order inside a renovation is fixed: hacking first, then wiring and plumbing, waterproofing, tiling, ceiling, carpentry and painting last. Our guide to the order of works explains why. A two-stage job is that same sequence with a long gap near the end. Everything before carpentry should happen in stage one. The gap should only ever sit where a gap does no harm.

If your budget is the reason for the split, our guide to what to prioritise in a resale HDB renovation on a limited budget sets out where the money matters most.

Questions to ask in writing before you sign

  1. Which items are in stage one, and which are in stage two? Please list them.
  2. Which points, pipes and cables will be left ready now for stage-two work?
  3. Will you mark the point positions against the future carpentry drawing before the walls are closed?
  4. Does the flooring run under the stage-two carpentry or stop at it?
  5. How long does the stage-two price hold, and what changes it?
  6. Who is responsible for anything that fails where the two stages meet?
  7. How will the finished stage-one surfaces be protected while stage two is done?

What to do this week

  1. Write two lists: what must be finished before you move in, and what you can live without for a year.
  2. Sketch the rooms you are leaving for stage two, with where the wardrobe, desk and console will go.
  3. Give that sketch to your contractor before the electrician marks any wall.
  4. Ask for the answers to the seven questions above in writing.

We are an HDB Licensed Renovation Contractor, HB-09-5667H, and our HDB renovation page sets out what we do in a flat. You can see how a job looks mid-way on our live jobs page. Planning to split a renovation into two stages? WhatsApp us on 9107 2601 with the flat type, the estate and what you want in each stage, and we will arrange a site visit. Any price depends on that visit.

Related reading: order of works in a Singapore renovation · renovating while living in the flat · resale HDB renovation on a limited budget · which HDB walls you can remove

Frequently asked questions

What should be done in the first stage of a two-stage renovation?
Everything that goes behind a surface: hacking and wall changes, electrical and plumbing (including points and pipes for rooms you will finish later), waterproofing and bathroom tiling, flooring and ceiling work, aircon piping and the first coat of paint. These are hard and costly to reach once the surface is closed.
What can safely wait for a second stage?
Work that sits on top of a finished surface: some of the carpentry such as a shoe cabinet, TV console or a bedroom wardrobe, light fittings (as long as the cable and position were left ready), feature walls and wallpaper, loose furniture and curtains.
Why do the electrical points matter if the carpentry is done later?
Sockets and switches are set against a plan. If the future carpentry is not drawn, nobody knows which points will end up behind a panel or at the wrong height. Draw the carpentry roughly before the electrician marks the walls, or ask for extra points in the rooms left for later, because adding a point to a finished wall means chasing it.
Is it a good idea to use a different contractor for the second stage?
It can save money, but the risk is the join between the two stages. Ask each contractor in writing what is covered and who is responsible for anything that fails where the two stages meet.
How much does a two-stage renovation cost?
Larry Contractors does not publish a price for splitting a renovation into stages. What each stage costs depends on the flat and the scope, so a figure is given after a site visit. Ask in writing how long a stage-two price holds.
Larry Hoo — HDB Licensed Renovation Contractor (HB-09-5667H)

Larry Contractors Pte Ltd · 15+ years · 500+ projects · own carpentry factory in Singapore. Read more about Larry →